Your TR Source

Report

584 Results

Record for Civilian Conservation Corps Job #244

Record for Civilian Conservation Corps Job #244

The Civilian Conservation Corp job record #244 for emergency work within the southern unit of the Roosevelt Recreational Demonstration Area (SP-8) in western North Dakota. Emergency work consisted of removing snow and ice from water drainage areas to protect it from erosion and traffic damage; job documentation attached.

Collection

Theodore Roosevelt National Park

Creation Date

1938

Roosevelt regional park job classification #303(d)

Roosevelt regional park job classification #303(d)

Roosevelt Regional Park job classification report for job #303(d) provides administrative documentation on the construction of 1.9 miles of park road between existing and projected roads in the Roosevelt Recreational Demonstration Area. Attached to the report are two letters regarding the project and submitted report.

Collection

Theodore Roosevelt National Park

Creation Date

1936-08

Remarks of Philippe Bunau-Varilla before the board of consulting engineers

Remarks of Philippe Bunau-Varilla before the board of consulting engineers

Philippe Bunau-Varilla writes to the board of consulting engineers to propose solutions to the Panama Canal construction. He discusses the dominating factors of the “Panama problem,” namely the future necessity of a sea-level canal and the availability of comparable projects to use as reference points. Examining the topography of the adjacent waterways, he provides justification for placing dams at Gamboa and Bohio to help with flood control of the Chagres River and with the storage of water for dry seasons. He then dispenses with problem of the Culebra cut, which he does not see as “the controlling factor” of the construction. In the third part of his report, Bunau-Varilla rebuts the view of Chief Engineer John F. Wallace and others by arguing that, without interruption to international navigation, a canal built with locks can be gradually transformed into a sea-level waterway if the dimensions of the channel bottom are increased from 150 feet to 300 feet. He goes on to explain the logistics of that future transformation and the costs involved. Feeling he has satisfied “all the enormous interests involved,” Bunau-Varilla concludes by arguing that his plan offers the fastest and safest solution that “affords the required ample and permanent communication between the oceans.”

Collection

Library of Congress Manuscript Division

Creation Date

1905-09-15

Statement of Jacob P. Frech

Statement of Jacob P. Frech

Private Jacob P. Frech describes his involvement in removing Laura A. Hull Morris from the White House. Frech claims that Morris was uncooperative, even kicking him in the groin. A witness claims that the guards used a reasonable amount of force considering the manner in which Morris protested her removal, calling her a “large, strong woman.”

Collection

Library of Congress Manuscript Division

Creation Date

1906-01-19

Report regarding the USS Bennington

Report regarding the USS Bennington

The Department of the Navy has considered the Court of Inquiry findings regarding the Bennington explosion, agreeing with most points except that the Bennington was in excellent condition. The explosion was partially caused by neglect and improper maintenance of at least one boiler valve. The actions of all men during the disaster are commended.

Collection

Library of Congress Manuscript Division

Creation Date

1905-08-29

Record for Civilian Conservation Corps job #16

Record for Civilian Conservation Corps job #16

The Civilian Conservation Corp job record #16 is in regard to park road obliteration project (.16 mile in length) near the stone bridge in the northern unit of the Roosevelt Recreational Demonstration Area (SP-7) in western North Dakota. The project will remove a section of road and restore natural landscaping. Job application and completion record attached.

Collection

Theodore Roosevelt National Park

Creation Date

1938-04-11